Detailed information on the new seabed areas granted to the PGE Group:
Area 43.E.1:
Located close to offshore wind farms projects already under development by PGE and to O&M base currently under development in Ustka, Poland.
Capacity potential: 990 MW
Area surface: about 118 sq. km
Distance to shore: about 42 km
Area 44.E.1:
Located close to offshore wind farms projects already under development by PGE and to O&M base currently under development in Ustka, Poland.
Capacity potential: 975 MW
Area surface: about 121 sq. km
Distance to shore: about 48 km
Area 60.E.3:
Area directly neighboring with Baltica 1 project under development by PGE.
Capacity potential: 1185 MW
Area surface: about 143 sq. km
Distance to shore: ok. 78 km
Obszar 60.E.4:
Area located close to Baltica 1 project under development by PGE..
Capacity potential: 555 MW
Area surface: about 77 sq. km
Distance to shore: about 85 km
Area 45.E.1:
Area located close to Baltica 2 and Baltica 3 projects under development, directly adjacent to Baltica 2. Area was applied for jointly by PGE and Ørsted.
Potential capacity: 210 MW
Area Surface: about 17 sq. km
Distance to shore: about 32 km
The total potential of offshore wind farms that can be developed in all these areas exceed 3.9 GW. Currently, the PGE Group is preparing to build offshore wind farms in the Baltic Sea with a total capacity of 3.4 GW. Baltica 2 with a capacity of 1.5 GW and Baltica 3 with a capacity of 1 GW will make up the Baltica Offshore Wind Farm, which is to start producing electricity later this decade. PGE is developing this project in cooperation with Ørsted. Independently from the Baltica OWF, the PGE Group is preparing for development of the Baltica 1 project with a capacity of approx. 0.9 GW. This wind farm is scheduled for commissioning after 2030.